August 2026 Construction Progress abdul Sep 01, 2026 Progress reports Preparation for second floor concrete pouring was in top gear within the early weeks of August and by 29th of August, the second floor slab was achieved. Gallery (8 images) Tags: #Victoria Island #Construction Progress #Property Investment